Standard/Engineer builds are done at OOBE on the imaging floor
Everything after OOBE needs the employee to log in, which happens off the PXE network, so the floor waited forever at step 3 of 5. Now 3 steps: WinPE, Windows setup installing apps, ready at OOBE (succeeded). - both unattends: specialize Order 49 posts step 3 as succeeded (Path 182 chars; lint clean). Only that line changed. - Send-ImagingStage.ps1: StageTotal 3; steps above the total (the old first-logon steps 4 and 5 still in the unattends) are logged and not posted, so they cannot reopen a finished build - winpe-status-push.ps1: total 3 for gea-standard / gea-engineer - floor tile step 3: "Ready at OOBE" Tested in the win11 VM against the test server: steps 2 and 3 post, step 3 shows succeeded, step 4 is skipped. Not deployed: the unattends go out only through scripts/deploy-unattend.sh.
This commit is contained in:
@@ -311,8 +311,8 @@
|
||||
</RunSynchronousCommand>
|
||||
<RunSynchronousCommand wcm:action="add">
|
||||
<Order>49</Order>
|
||||
<Path>powershell.exe -NoP -EP Bypass -File C:\ProgramData\PxeStatus\Send-ImagingStage.ps1 -PCType gea-engineer -StageIndex 3 -Stage "Apps installed - waiting for first logon"</Path>
|
||||
<Description>PXE status: stage 3 of 5</Description>
|
||||
<Path>powershell.exe -NoP -EP Bypass -File C:\ProgramData\PxeStatus\Send-ImagingStage.ps1 -PCType gea-engineer -StageIndex 3 -Status succeeded -Stage "Ready at OOBE - hand to the employee"</Path>
|
||||
<Description>PXE status: stage 3 of 3, done (the rest needs the employee to log in)</Description>
|
||||
</RunSynchronousCommand>
|
||||
</RunSynchronous>
|
||||
</component>
|
||||
|
||||
Reference in New Issue
Block a user