Commit Graph

1 Commits

Author SHA1 Message Date
cproudlock
02499cf74b docs: post-deploy checklist + COM 2/4 PCIe serial-port flowchart update
New post-deploy-checklist.md (+ live.html + static.html siblings):
- Four-section terse coach checklist run after a freshly imaged PC
  reaches the login screen. Pairs with the existing post-deploy debug
  flowchart for failure paths.
- Sections: Common Shop Floor opens + connects, controller comms
  (ping 192.168.1.1 / NTLARS General+FMS), UDC COM port matches
  physical socket + no machine-comm error dialog + Tools > Retry
  Connection succeeds, printers ready (Genspect-specific note).

post-deploy-debug-flowchart.md:
- COM port mapping: PCIe add-in card now listed as 'COM 2 or COM 4'
  (Windows enumeration varies by hardware) instead of fixed COM 2.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-21 19:39:15 -04:00