Commit Graph

2 Commits

Author SHA1 Message Date
cproudlock
8cd0c147d8 imaging: renumber stages to be time-monotonic (1=WinPE, 7=Intune ID)
Previously the stage indices reflected logical milestones but not the
order they fire in. Run-ShopfloorSetup posted idx=1 (start) and idx=4
(PPKG) - but 09-Setup-Keyence (inside per-type loop) ran BETWEEN them
and posted idx=5/6. The dashboard then "regressed" from 6 back to 4
when PPKG fired, making it look stuck at the per-type-complete card.

New numbering matches actual execution order:

  1 - WinPE: PESetup / WIM apply              (startnet.cmd)
  2 - Run-ShopfloorSetup: starting            (Run-ShopfloorSetup.ps1)
  3 - 09-Setup-<Type>: starting               (per-type)
  4 - 09-Setup-<Type>: complete               (per-type)
  5 - Run-ShopfloorSetup: PPKG enrollment     (Run-ShopfloorSetup.ps1)
  6 - Run-ShopfloorSetup: handoff to Monitor  (Run-ShopfloorSetup.ps1)
  7 - Monitor-IntuneProgress: Intune Device ID captured

services/imaging_status.py rewind threshold reverts to stage_index <= 1
now that WinPE startnet posts idx=1.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-13 11:34:01 -04:00
cproudlock
908b668bde shopfloor: instrument 09-Setup-CMM, Common, Heattreat with Send-PxeStatus
Wires the imaging-progress helper into the three PC-type setup scripts
that were either clean (CMM) or untracked (Common, Heattreat). Each
gains two calls per the pattern committed for Keyence in 9122b28:

  * idx 5/8 - "09-Setup-<Type>: starting" right after the session start banner
  * idx 6/8 - "09-Setup-<Type>: complete" just before the completion banner

Display, Genspect, and WaxAndTrace also got the same two-line additions
locally and on the live server, but those files have pre-existing WIP
edits intermixed so they aren't staged here. They'll travel along
when the operator commits their unrelated shopfloor work.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-13 10:17:24 -04:00