Everything after OOBE needs the employee to log in, which happens off the
PXE network, so the floor waited forever at step 3 of 5. Now 3 steps:
WinPE, Windows setup installing apps, ready at OOBE (succeeded).
- both unattends: specialize Order 49 posts step 3 as succeeded
(Path 182 chars; lint clean). Only that line changed.
- Send-ImagingStage.ps1: StageTotal 3; steps above the total (the old
first-logon steps 4 and 5 still in the unattends) are logged and not
posted, so they cannot reopen a finished build
- winpe-status-push.ps1: total 3 for gea-standard / gea-engineer
- floor tile step 3: "Ready at OOBE"
Tested in the win11 VM against the test server: steps 2 and 3 post,
step 3 shows succeeded, step 4 is skipped. Not deployed: the unattends
go out only through scripts/deploy-unattend.sh.