Files
pxe-server/webapp/templates
cproudlock 9d75d03b2d Standard/Engineer builds are done at OOBE on the imaging floor
Everything after OOBE needs the employee to log in, which happens off the
PXE network, so the floor waited forever at step 3 of 5. Now 3 steps:
WinPE, Windows setup installing apps, ready at OOBE (succeeded).

- both unattends: specialize Order 49 posts step 3 as succeeded
  (Path 182 chars; lint clean). Only that line changed.
- Send-ImagingStage.ps1: StageTotal 3; steps above the total (the old
  first-logon steps 4 and 5 still in the unattends) are logged and not
  posted, so they cannot reopen a finished build
- winpe-status-push.ps1: total 3 for gea-standard / gea-engineer
- floor tile step 3: "Ready at OOBE"

Tested in the win11 VM against the test server: steps 2 and 3 post,
step 3 shows succeeded, step 4 is skipped. Not deployed: the unattends
go out only through scripts/deploy-unattend.sh.
2026-10-16 10:09:40 -04:00
..