A toner rate needs days behind it, not just readings
Reported from the floor: two printers showing 81 and 83 percent, both forecast to run out in a fortnight. That is a rate near 5.8 percent a day on a cartridge barely touched. burn_rate required four readings and a 2 point drop, and checked only that some time had passed - not how much. Supply items are commonly polled every few minutes, so four readings can span a quarter of an hour, and a 2 point drop across fifteen minutes extrapolates to nearly 200 percent a day. The report then sorted that confident wrong number into "soon", next to cartridges that really are about to run out. It did not look broken; it looked urgent. A rate now needs two days behind it. Two days is the smallest span that survives a printer's daily rhythm, so one heavy morning does not become the whole picture. Below that the answer is "not enough history yet", which the report already has a home for: band() returns None and the row lands in the "No estimate yet" section with its reason shown, rather than competing for attention with real urgency. This is the third face of the same fault. A phantom replacement truncated the run - "2 replacements in 2.3 days" was the same printer saying so - and the rate was then fitted to whatever short stub remained. The near-full rule and the dip filter stop the truncation; this stops a stub from producing a number at all.
This commit is contained in:
@@ -37,6 +37,18 @@ NEW_CARTRIDGE_LEVEL = 80
|
||||
# through a coarse gauge can "prove" any rate at all.
|
||||
MIN_POINTS_FOR_ESTIMATE = 4
|
||||
|
||||
# A rate needs TIME behind it, not just readings. Supply items are often polled
|
||||
# every few minutes, so four readings can span a quarter of an hour - and a 2
|
||||
# point drop across fifteen minutes extrapolates to nearly 200 percent a day,
|
||||
# which is how a cartridge sitting at 82 percent gets forecast to run out in a
|
||||
# fortnight. The history window can be short for the same reason: the fetch
|
||||
# keeps the newest rows up to a per-item cap, so a fast-polled item returns days
|
||||
# rather than the ninety asked for.
|
||||
#
|
||||
# Two days is the smallest span that survives a printer's daily rhythm - a
|
||||
# single heavy morning does not become the whole picture.
|
||||
MIN_DAYS_FOR_ESTIMATE = 2
|
||||
|
||||
# Many printers report in 10% steps, so a fortnight can pass on one plateau.
|
||||
# Without a minimum observed drop the slope reads as zero and the forecast
|
||||
# says "never", which is worse than saying nothing.
|
||||
@@ -201,7 +213,7 @@ def burn_rate(points):
|
||||
if len(points) < MIN_POINTS_FOR_ESTIMATE:
|
||||
return None
|
||||
total_days = (points[-1][0] - points[0][0]).total_seconds() / 86400
|
||||
if total_days <= 0:
|
||||
if total_days < MIN_DAYS_FOR_ESTIMATE:
|
||||
return None
|
||||
# The overall drop still gates the estimate: a gauge sitting on one plateau
|
||||
# has not proved anything yet, whatever the intervals say.
|
||||
@@ -290,7 +302,8 @@ def analyse(points, rise=REPLACEMENT_RISE, currentlevel=None):
|
||||
|
||||
if rate is None:
|
||||
# Say which of the three it is; "no estimate" alone invites a bug report.
|
||||
if len(run) < MIN_POINTS_FOR_ESTIMATE:
|
||||
basis = result.get('basisdays') or 0
|
||||
if len(run) < MIN_POINTS_FOR_ESTIMATE or basis < MIN_DAYS_FOR_ESTIMATE:
|
||||
result['reason'] = ('replaced recently' if replacements
|
||||
else 'not enough history yet')
|
||||
else:
|
||||
|
||||
Reference in New Issue
Block a user