shopdb-flask/docs/adr/README.md
cproudlock 24f67d6ac5
Some checks failed
CI / backend (push) Failing after 1m2s
CI / naming (push) Successful in 1s
CI / frontend (push) Successful in 7s
Accept + implement ADR-010 frontend plugin hooks (contract 0.7.0)
Four data-only hooks on BasePlugin (get_settings_cards,
get_asset_panels, get_map_overlays, get_asset_presentation) with a
GET-only /api/pluginui consumer surface copying the dashboard-widgets
semantics. Pilots: warranty declares its asset panel; measuringtools
supplies its settings card, presentation, and calibration overlay -
the last hardcoded settings-nav entry is now hook-sourced. Generic
renderers for panels/overlays/presentation deferred per the ADR's
incremental adoption plan (documented in CONTRACT-STABILITY.md).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-11 19:38:32 -04:00

1.7 KiB

Architecture Decision Records

Each ADR captures a single architectural decision: the context, the decision itself, the consequences, and the alternatives considered. ADRs are immutable once accepted. Superseded ADRs stay in this folder with a pointer to the newer ADR.

Status definitions

  • PROPOSED: drafted, awaiting decision
  • ACCEPTED: decision is in effect
  • SUPERSEDED: replaced by a later ADR (link forward)
  • DEPRECATED: no longer in effect, no replacement

Index

ADR Title Status
001 Asset model is the platform contract ACCEPTED
002 Plugin contract versioning (semver) ACCEPTED
003 Plugin distribution model ACCEPTED
004 Deployment topology (per-site instances) ACCEPTED
005 Equipment vs measuringtools plugin scope ACCEPTED
006 Plugin collector contract pattern ACCEPTED
007 Product versioning and releases ACCEPTED
008 Plugin migration ownership (per-plugin chains) ACCEPTED
009 Frontend plugin route gating ACCEPTED
010 Frontend plugin hook contract ACCEPTED
011 Machines rename + modeltypes retyping ACCEPTED

Authoring

When proposing a new decision, copy the most recent ADR as a template, increment the number, and update this index. Do not edit accepted ADRs in place; supersede them with a new one.