Consolidate documentation: archive 45+ historical docs
- Move completed migration docs to docs/archive/ - Move session summaries to docs/archive/sessions/ - Rename API_ASP_DOCUMENTATION.md to docs/API.md - Archive redundant Claude reference files - Update docs/README.md as simplified index - Reduce active docs from 45+ files to 8 essential files Remaining docs: - CLAUDE.md (AI context) - TODO.md (task tracking) - docs/README.md, API.md, QUICK_REFERENCE.md - docs/ASP_DEVELOPMENT_GUIDE.md, STANDARDS.md 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
357
docs/archive/COMPLETE_REFACTORING_SUMMARY.md
Normal file
357
docs/archive/COMPLETE_REFACTORING_SUMMARY.md
Normal file
@@ -0,0 +1,357 @@
|
||||
# Complete Database Refactoring - Executive Summary
|
||||
|
||||
**Date**: 2025-11-06
|
||||
**Status**: DESIGN PHASE - Ready for Review
|
||||
**Scope**: MASSIVE - Complete database restructuring
|
||||
|
||||
---
|
||||
|
||||
## Overview
|
||||
|
||||
This document provides a high-level overview of the complete database refactoring project. This is a comprehensive modernization effort that will:
|
||||
|
||||
1. **Consolidate PCs into Machines** - Eliminate duplicate entity tracking
|
||||
2. **Create Generic Communications Infrastructure** - Flexible, extensible communication tracking
|
||||
3. **Implement Warranty Management System** - Professional warranty tracking for all assets
|
||||
|
||||
---
|
||||
|
||||
## Three Major Components
|
||||
|
||||
### Component 1: PC-to-Machines Consolidation
|
||||
**Document**: `PC_MACHINES_CONSOLIDATION_PLAN.md`
|
||||
|
||||
**What**: Merge the `pc` table (277 records) into `machines` table (266 records)
|
||||
|
||||
**Why**:
|
||||
- Eliminate duplicate entity tracking
|
||||
- Simplify data model
|
||||
- Unified asset management
|
||||
|
||||
**Impact**:
|
||||
- 543 total machines after consolidation
|
||||
- 10 ASP files need updates (direct queries)
|
||||
- 30 ASP files affected (use pc fields/views)
|
||||
- 19 database views need updates
|
||||
- 6 related tables need updates
|
||||
|
||||
### Component 2: Communications Infrastructure
|
||||
**Document**: `PC_MACHINES_CONSOLIDATION_PLAN.md` (Part 2)
|
||||
|
||||
**What**: Create generic communications system supporting multiple types
|
||||
|
||||
**New Tables**:
|
||||
- `comstypes` - Communication types (IP, Serial, Network, USB, etc.)
|
||||
- `communications` - Universal communication tracking
|
||||
|
||||
**Features**:
|
||||
- Supports IP addresses, serial ports, network interfaces
|
||||
- Extensible for future communication types
|
||||
- Links to machines via machineid
|
||||
- Replaces pc_comm_config and pc_network_interfaces
|
||||
|
||||
### Component 3: Warranty Management System
|
||||
**Document**: `WARRANTY_MANAGEMENT_DESIGN.md`
|
||||
|
||||
**What**: Professional warranty tracking system for all machines
|
||||
|
||||
**New Tables**:
|
||||
- `warrantytypes` - Types of coverage
|
||||
- `warranties` - Individual warranty records (links to existing vendors table)
|
||||
- `warrantyhistory` - Audit trail for changes
|
||||
|
||||
**Features**:
|
||||
- Multiple warranties per machine
|
||||
- Warranty renewal tracking
|
||||
- Automated expiration notifications
|
||||
- Cost tracking
|
||||
- Historical audit trail
|
||||
|
||||
---
|
||||
|
||||
## Database Changes Summary
|
||||
|
||||
### New Tables (5 total)
|
||||
|
||||
| Table | Records | Purpose |
|
||||
|-------|---------|---------|
|
||||
| comstypes | ~7 | Communication type definitions |
|
||||
| communications | ~500+ | Machine communication records |
|
||||
| warrantytypes | ~8 | Warranty coverage types |
|
||||
| warranties | ~277+ | Individual warranty records (uses existing vendors table) |
|
||||
| warrantyhistory | ~0 | Warranty change audit trail |
|
||||
|
||||
### Modified Tables (1)
|
||||
|
||||
| Table | Changes | New Columns |
|
||||
|-------|---------|-------------|
|
||||
| machines | Extended for PC data | +9 columns (hostname, serialnumber, osid, pctypeid, etc.) |
|
||||
|
||||
### Deprecated Tables (To be removed after migration)
|
||||
|
||||
| Table | Replacement | When to Remove |
|
||||
|-------|-------------|----------------|
|
||||
| pc | machines | After 30-day testing period |
|
||||
| pc_comm_config | communications | After data migration verified |
|
||||
| pc_network_interfaces | communications | After data migration verified |
|
||||
|
||||
### Views to Update (19)
|
||||
|
||||
All views currently using the `pc` table will be updated to use `machines` with compatibility maintained.
|
||||
|
||||
---
|
||||
|
||||
## Migration Execution Order
|
||||
|
||||
### Phase 1: Infrastructure Setup (Scripts 01-04)
|
||||
**Reversible**: Yes
|
||||
|
||||
1. Script 01: Create communications infrastructure
|
||||
2. Script 02: Extend machines table
|
||||
3. Script 03: Create PC machine types
|
||||
4. Script 04: Create warranty infrastructure
|
||||
|
||||
**Production Deployment**: Run during maintenance window
|
||||
**Estimated Time**: 15 minutes
|
||||
**Rollback**: Rollback scripts 01-04 available
|
||||
|
||||
### Phase 2: Data Migration (Scripts 05-08)
|
||||
**Reversible**: Yes (with backups)
|
||||
|
||||
5. Script 05: Migrate PC data to machines
|
||||
6. Script 06: Migrate communication data
|
||||
7. Script 07: Migrate warranty data
|
||||
8. Script 08: Update relationship tables
|
||||
|
||||
**Production Deployment**: Run during maintenance window
|
||||
**Estimated Time**: 30-45 minutes
|
||||
**Rollback**: Restore from backup
|
||||
|
||||
### Phase 3: Application Updates (Manual)
|
||||
**Reversible**: Yes (via version control)
|
||||
|
||||
9. Update 19 database views
|
||||
10. Create compatibility views
|
||||
11. Update 10 ASP files (direct queries)
|
||||
12. Update 30 ASP files (pc fields/views)
|
||||
13. Test all functionality
|
||||
|
||||
**Production Deployment**: Deploy with application
|
||||
**Estimated Time**: 2-3 weeks development + testing
|
||||
**Rollback**: Revert code deployment
|
||||
|
||||
### Phase 4: Cleanup (After 30 days)
|
||||
**Reversible**: No - PERMANENT
|
||||
|
||||
14. Drop pc table
|
||||
15. Drop pc_comm_config table
|
||||
16. Drop pc_network_interfaces table
|
||||
17. Drop compatibility views
|
||||
18. Remove deprecated columns
|
||||
|
||||
**Production Deployment**: Final cleanup
|
||||
**Estimated Time**: 15 minutes
|
||||
**Rollback**: None (irreversible)
|
||||
|
||||
---
|
||||
|
||||
## Complete SQL Script List
|
||||
|
||||
### Creation Scripts
|
||||
1. `sql/01_create_communications_infrastructure.sql`
|
||||
2. `sql/02_extend_machines_table.sql`
|
||||
3. `sql/03_create_pc_machine_types.sql`
|
||||
4. `sql/04_create_warranty_infrastructure.sql`
|
||||
|
||||
### Migration Scripts (TBD)
|
||||
5. `sql/05_migrate_pc_to_machines.sql`
|
||||
6. `sql/06_migrate_communications.sql`
|
||||
7. `sql/07_migrate_warranties.sql`
|
||||
8. `sql/08_update_relationships.sql`
|
||||
|
||||
### View Scripts (TBD)
|
||||
9. `sql/09_update_views.sql`
|
||||
10. `sql/10_create_compatibility_views.sql`
|
||||
|
||||
### Rollback Scripts
|
||||
- `sql/ROLLBACK_01_communications_infrastructure.sql`
|
||||
- `sql/ROLLBACK_02_machines_table_extensions.sql`
|
||||
- `sql/ROLLBACK_03_pc_machine_types.sql` (delete from machinetypes)
|
||||
- `sql/ROLLBACK_04_warranty_infrastructure.sql`
|
||||
|
||||
---
|
||||
|
||||
## Benefits of This Refactoring
|
||||
|
||||
### Before Refactoring
|
||||
|
||||
**Data Model**:
|
||||
- Machines and PCs tracked separately
|
||||
- Warranty data scattered across PC records
|
||||
- Communication data in PC-specific tables
|
||||
- Multiple machines types systems (machines.machinetypeid, pc.pctypeid)
|
||||
- Rigid communication tracking
|
||||
- No warranty history
|
||||
- Limited to one warranty per PC
|
||||
|
||||
**Code**:
|
||||
- Duplicate logic for machines vs PCs
|
||||
- Complex joins across pc/machines
|
||||
- PC-specific ASP files
|
||||
- Warranty tracking only for PCs
|
||||
|
||||
### After Refactoring
|
||||
|
||||
**Data Model**:
|
||||
- Unified machine tracking (all assets)
|
||||
- Professional warranty management
|
||||
- Generic communication infrastructure
|
||||
- Single machine type system
|
||||
- Extensible for new communication types
|
||||
- Complete warranty audit trail
|
||||
- Multiple warranties per machine
|
||||
|
||||
**Code**:
|
||||
- Single codebase for all machines
|
||||
- Simpler queries
|
||||
- Unified ASP files
|
||||
- Warranty tracking for ALL machines
|
||||
- Better reporting capabilities
|
||||
|
||||
---
|
||||
|
||||
## Risk Assessment
|
||||
|
||||
| Risk | Severity | Likelihood | Mitigation |
|
||||
|------|----------|------------|------------|
|
||||
| Data loss during migration | CRITICAL | Low | Full backups, dev testing, rollback scripts |
|
||||
| Extended downtime | HIGH | Medium | Parallel testing, staged deployment |
|
||||
| View compatibility issues | HIGH | Medium | Compatibility views, thorough testing |
|
||||
| Performance degradation | MEDIUM | Low | Indexes optimized, query testing |
|
||||
| Application bugs | MEDIUM | Medium | Comprehensive testing, UAT |
|
||||
| User confusion | LOW | Medium | Documentation, training |
|
||||
|
||||
---
|
||||
|
||||
## Timeline & Effort Estimate
|
||||
|
||||
| Phase | Duration | Resources |
|
||||
|-------|----------|-----------|
|
||||
| Design & Review | 1-2 days | COMPLETE |
|
||||
| SQL Script Development | 3-5 days | In Progress |
|
||||
| Dev Environment Testing | 3-5 days | Pending |
|
||||
| ASP File Updates | 5-7 days | Pending |
|
||||
| Integration Testing | 3-5 days | Pending |
|
||||
| User Acceptance Testing | 2-3 days | Pending |
|
||||
| Production Deployment | 1 day | Pending |
|
||||
| Monitoring Period | 30 days | Pending |
|
||||
| Final Cleanup | 1 day | Pending |
|
||||
| **TOTAL** | **20-35 days** | |
|
||||
|
||||
---
|
||||
|
||||
## Key Success Metrics
|
||||
|
||||
### Data Integrity
|
||||
- [ ] All 277 PCs migrated to machines
|
||||
- [ ] All communication records migrated
|
||||
- [ ] All warranty records migrated
|
||||
- [ ] All FK relationships intact
|
||||
- [ ] Zero data loss
|
||||
|
||||
### Functionality
|
||||
- [ ] All 19 views return correct data
|
||||
- [ ] All ASP files working correctly
|
||||
- [ ] Warranty tracking functional
|
||||
- [ ] Communication tracking functional
|
||||
- [ ] Reports generating correctly
|
||||
|
||||
### Performance
|
||||
- [ ] Query performance same or better
|
||||
- [ ] Page load times acceptable
|
||||
- [ ] Database size reduced (from consolidation)
|
||||
|
||||
---
|
||||
|
||||
## Production Deployment Checklist
|
||||
|
||||
### Pre-Deployment
|
||||
- [ ] All SQL scripts tested on dev
|
||||
- [ ] All ASP files tested
|
||||
- [ ] All views validated
|
||||
- [ ] Performance testing complete
|
||||
- [ ] UAT sign-off received
|
||||
- [ ] Rollback plan documented
|
||||
- [ ] Full database backup created
|
||||
- [ ] Maintenance window scheduled
|
||||
- [ ] Users notified
|
||||
|
||||
### Deployment Day
|
||||
- [ ] Verify backup completed
|
||||
- [ ] Run scripts 01-04 (infrastructure)
|
||||
- [ ] Verify tables created
|
||||
- [ ] Run scripts 05-08 (data migration)
|
||||
- [ ] Verify data migrated
|
||||
- [ ] Update views
|
||||
- [ ] Deploy ASP files
|
||||
- [ ] Smoke test functionality
|
||||
- [ ] Monitor for errors
|
||||
|
||||
### Post-Deployment
|
||||
- [ ] Verify all functionality
|
||||
- [ ] Monitor performance
|
||||
- [ ] Check error logs
|
||||
- [ ] User feedback collection
|
||||
- [ ] Document issues
|
||||
- [ ] Plan fixes if needed
|
||||
|
||||
### 30-Day Cleanup
|
||||
- [ ] Verify stability
|
||||
- [ ] Run cleanup scripts
|
||||
- [ ] Remove old tables
|
||||
- [ ] Update documentation
|
||||
- [ ] Close project
|
||||
|
||||
---
|
||||
|
||||
## Documentation Index
|
||||
|
||||
1. **PC_MACHINES_CONSOLIDATION_PLAN.md** - Complete PC consolidation design
|
||||
2. **WARRANTY_MANAGEMENT_DESIGN.md** - Warranty system design
|
||||
3. **COMPLETE_REFACTORING_SUMMARY.md** - This document (overview)
|
||||
|
||||
---
|
||||
|
||||
## Questions & Approvals
|
||||
|
||||
### Design Decisions Needed
|
||||
- [ ] Approve warranty system design
|
||||
- [ ] Approve communications infrastructure
|
||||
- [ ] Approve PC machine type mapping
|
||||
- [ ] Set maintenance window date
|
||||
|
||||
### Approvals Required
|
||||
- [ ] Database Administrator
|
||||
- [ ] Lead Developer
|
||||
- [ ] System Owner
|
||||
- [ ] Business Stakeholder
|
||||
|
||||
---
|
||||
|
||||
## Support & Contact
|
||||
|
||||
**For questions about this refactoring:**
|
||||
- Review design documents first
|
||||
- Check rollback procedures
|
||||
- Test on dev environment
|
||||
- Contact system administrator
|
||||
|
||||
---
|
||||
|
||||
**Status**: DESIGN PHASE COMPLETE
|
||||
**Next Step**: Create migration scripts (scripts 05-08)
|
||||
**Target Deployment**: TBD
|
||||
|
||||
---
|
||||
|
||||
*This is a living document and will be updated as the project progresses.*
|
||||
Reference in New Issue
Block a user