The floor's 8 stages are the shopfloor pipeline, and only shopfloor-setup reports after WinPE, so every gea-standard / gea-engineer build sat at 1/8 forever with no type. - winpe-status-push.ps1 reads the image from the Z: share mapping when no PCTYPE is set and reports those builds as 5 steps. - Send-ImagingStage.ps1 (deployed to _shared\Applications\extra\pxe-status) posts steps 2-5 from the unattend: start and end of specialize, first logon, and setup complete (succeeded). It is copied to C:\ProgramData\PxeStatus first, because the bulk-enrollment task deletes C:\Deploy before first logon. Best-effort: always exits 0. - Floor rows use Standard/Engineer labels and show the image as the kind. Tested as SYSTEM in the win11 VM (PowerShell 5.1): the exact unattend command line, stages 3-5 against a test server, a dead port (exit 0), and the image regex.
15 KiB
15 KiB