Everything after OOBE needs the employee to log in, which happens off the PXE network, so the floor waited forever at step 3 of 5. Now 3 steps: WinPE, Windows setup installing apps, ready at OOBE (succeeded). - both unattends: specialize Order 49 posts step 3 as succeeded (Path 182 chars; lint clean). Only that line changed. - Send-ImagingStage.ps1: StageTotal 3; steps above the total (the old first-logon steps 4 and 5 still in the unattends) are logged and not posted, so they cannot reopen a finished build - winpe-status-push.ps1: total 3 for gea-standard / gea-engineer - floor tile step 3: "Ready at OOBE" Tested in the win11 VM against the test server: steps 2 and 3 post, step 3 shows succeeded, step 4 is skipped. Not deployed: the unattends go out only through scripts/deploy-unattend.sh.
16 KiB
16 KiB