New post-deploy-checklist.md (+ live.html + static.html siblings): - Four-section terse coach checklist run after a freshly imaged PC reaches the login screen. Pairs with the existing post-deploy debug flowchart for failure paths. - Sections: Common Shop Floor opens + connects, controller comms (ping 192.168.1.1 / NTLARS General+FMS), UDC COM port matches physical socket + no machine-comm error dialog + Tools > Retry Connection succeeds, printers ready (Genspect-specific note). post-deploy-debug-flowchart.md: - COM port mapping: PCIe add-in card now listed as 'COM 2 or COM 4' (Windows enumeration varies by hardware) instead of fixed COM 2. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
3.2 KiB
3.2 KiB